Tue, 29 December
Recording studio equipped with specialized furniture.
Hotel is in final completition phase. The full report in the
next news issue.
|
|
|
Sun, 29 November
First session in the outer space.
|
|
|
Wed, 14 October
Crazy music hotel under construction at least. We're trying to make berthing space more berthing. But now some words about recording rooms.
|
|
|
Tue, 8 Setember
We are ending decorating of soundrecording studio rooms. Monitors of distant field are already assembled.
|
|
|
Tue, 25 August
Electricity. There was installed transformer substation.
|
|
|
Wed, 12 August
Interior of studio rooms.
|
|
|
Fra, 31 July
Decoration of walls and ceilings. Mounting of acoustic cables. The electric wiring. Trial records.
|
|
|
Tue, 14 July
Spivaki records in colour.
|
|
|
Mon, 25 May
And are piping :)
|
|
|
Tue, 12 May
Assembling of low-frequency traps in the control room is done. Calculation of electricity supply network and audio commutation completed.
|
|
|
Wed, 29 April
There were installed initial acoustic shells in all studio rooms. Calculations of the operation parameters for the control room are made.
|
|
|
Fra, 3 April
We make acoustic decorating in main studio rooms.
|
|
|
Mon, 16 March
It was fitted up acoustic skin of vocal room. We made test measurements. The results are excellent.
|
|
|
Sun, 1 March
What about U?
|
|
|
Fra, 27 February
Building materials are delivered. It is moved near acoustic decorating of Spivaki records.
|
|
|
Sut, 7 February
Crazy music hotel – indoor room facing.
|
|
|
Fra, 30 January
We travel a lot around the world and on our way collect ethnic musical instruments. Some parcels were already delivered from India and Nepal.
|
|
|
Wed, 21 January
We keep on indoor works in living rooms of Spivaki records.
|
|
|
Sun, 11 January
Indoor works in living rooms are still carried on. The accoustic project is ready. Spivaki is under the reign of Winter.
|
|
|
Mon, 13 October
It is known operation factors of piers for studio rooms. We start external facing of building. We are bringing building materials.
|
|
|
Wed, 8 October
It is carrying out outdoor works for walls thermal insulation. We install water-supply and sewerage system.
|
|
|
Wed, 1 October
We finished laying of roofing layers. We are laying ondulin. It is Indian summer out of doors.
|
|
|
Mon, 15 Setember
We covered waterproofing and vapour seal diaphragm. It became raining. It sharply turned cold.
|
|
|
Mon, 8 Setember
Frame were already installed. Window openings in the roof were took out. Floor of observation platform was laid.
|
|
|
Thu, 4 Setember
Fires are put down. No harm done to surroundings of Spivaki records. It is Autumn now.
|
|
|
Wed, 20 August
Building works are stopped.
|
|
|
Thu, 14 August
Sling system is assembled. We've got on 3rd level - it was assembled sceleton of observation platform.
|
|
|
Sun, 10 August
At the beginning of August in Spivaki the meeting took place. The theme was acoustic design of Spivaki records.
|
|
|
Wed, 30 July
Assembling of supporting roof constructions is going on.
|
|
|
Wed, 23 July
Roof constructions are mounted. Fasteners system is elaborated. Mounting is started.
|