Registration  
Remind password?

Playing, listening, happy :)

Wed, 29 April

Control room.
It is installed initial acoustic shell.
It is made check metering and calculation for geometry of low-frequency traps and for far field monitors.
There were chosen component materials for their making.
We made orders for loudspeakers JBL and Pioneer for far field monitors.
We projected horn for compression drivers.

Tune-hall.
It was assembled the most complicated component of acoustic shell of Spivaki records - inclined ceiling of acoustic hall.
The main level of the ceiling has 16º of diagonal flexure and incline.

So, we finished mounting of acoustic panels in all soundrecording rooms!
We are listening, we are measuring and thinking of.
The main thing is ahead - creation of Spivaki records acoustic.


The spring is at its brightest!

photo by Sergiy Dedishchev
Comments:


View: control room - tune-hall - stone room.



View: control room - tune-hall - stone room.


View: control room - tune-hall - stone room.


View: stone room - tune-hall - control room.


Tune-hall. To the left - windows to the Nature, straight ahe...


Tune-hall. To the left - entrance to the studio, straight ah...


View of control room from tune-hall.


Control room. To the left - entrance to the neutral room, to...


Installation of inclined ceiling in tune-hall.


Installation of inclined ceiling in tune-hall.


Installation of inclined ceiling in tune-hall.


Designing of control-room.


The Spring is with all its might!


The Spring is with all its might!


The Spring is with all its might!


Inhabitant Grigoriy Timofeyevich and goslings.


Openair platform of Spivaki records.

   

designed by art
© 2008 Spivaki Records