Registration  
Remind password?

Within the studio rooms.

Fra, 31 July

In studio rooms of Spivaki records there were laid acoustic cables and installed keyboards.
Electric wiring was set on.

Vocal room with neutral acoustic was completely decorated with textile.

In the control room there were installed horizontal law-frequency traps.
Our idea is - horizontal traps were made very neatly and fit in interior in organic way.
This fact saved us from necessity to hide traps behind blind ceiling and, as a result, our control room had height 4m.
Walls and ceiling of check room were practically completely covered with textile.
Frontal wall is waiting for facing with granite.
We are listening to the music on monitors of short-distance field.
It left the best impression.

In stone room is carrying on wall facing with granite.
Ceiling was plastered.

Acoustic hall is decorating with textile.

In all studio rooms are mounted door and extra window frames, in which we would install glass 12mm of thick.

During the readiness of studio rooms we test sound with the view to correct and analyse the acoustic.
One of the sessions with Egor Pavlov was very successful.
Release is coming soon.


Photo by Sergiy Dedishchev.
Comments:


Vocal room.



Control room.


Control room.


Making of patch panels.


Making of patch panels.


Patch panel of stone room.


Acoustic hall. Placing of cables.


Acoustic hall. Placing of cables.


Control room. Placing of cables.


Vocal room.


Stone room. Granite-work.


Stone room. Granite-work.


Soundrecording session.


Soundrecording session.

   

designed by art
© 2008 Spivaki Records