Registration  
Remind password?

May holidays and thunderstorms.

Tue, 12 May

In the control room we finished mounting of vertical low-frequency traps.
Horisontal ceiling traps are assembled, we started mounting.
Hanging of traps we make with the help of chains.

There were finished calculations of studio electricity supply network and it was made scheme of audio cables and commutation setting.
There were delivered wanted cables Klotz and connectors Neutrik.

Interior designer of Spivaki records picked out material for final facing of studio rooms, transparent in acoustic meaning: flannel, sacking and double rough cotton.
Color spectrum is warm, in Hindu style.

photo by Sergiy Dedishchev.
Comments:


Vertical low-friquency traps in the control room.



Vertical low-friquency traps in the control room. To the lef...


Vertical low-friquency traps in the control room.


Vertical low-friquency traps in the control room.


Vertical low-friquency traps in the control room.


Spivaki records. Window to the World.


Openair platform of Spivaki records. May.


designed by art
© 2008 Spivaki Records