The last frame stump was installed.
The whole bearing construction of both 2nd and 3rd levels was assembled with minimal error.
So, we feel ineffable joy of the fact =)
From the observation platform one can watch all surroundings of the soundrecording studio.
So that we are doing.
By the way, sound view atop differs with richness.
I.e. one can not only better see but hear better from above =)
Now we are passing to roofing works and mounting of multiply coverings.
Photo: Svetlana Pilipenko.
http://gal.gvp.kiev.ua/sve4i