Roofing works came to the end - it were assembled all supporting constructions, one could say, that all complexities left in the past.
We are thinking of live zone design.
It was chosen material for interior design of 2nd level rooms - it must be wood.
We developed optimal technology for multi-ply roof mounting.
The structure of layers (top down) is: ondulin, ruberoid, 20mm-board, 30mm of foam plastic, ruberoid, silicate cotton, vapour seal, 20mm-facing board.
We've got estimate for object glazing.
We choose of contractor-producer of observation tower and window systems.
Photo: Sergiy Dedishchev.