Walls are ready.
Around the periphery upper clad collar is cast, the hardware for 2nd level construction set into this collar.
Algorithm of roof assembling is coordinating.
The construction is enough complicated, but there is no possibility to use lifting crane because of absence of branch lines for heavy machines.
We are choosing roofing and heat-insulating materials for back rooms on the 2nd level.
We are preparing for pouring of slabs, considering variants of construction.
Photo: Evgenia Dedishcheva.
http://gal.gvp.kiev.ua/jackson